Vidhwaan
They say it's a different world altogether out there in the industry. But it's true that the real life challenges posing the industries in all domains are much more daunting than the ones we do within the confines of our lab.
So does that mean your education in a waste. No, we never said that. After all it's the same principles that are applied in solving industry problems.
So, solve some real industry challenges and show them what a true technologists and enginner is!
The Vidhwaan Challenge is to design an innovative technological solution to the energy requirements of a community of moderate or medium size. The energy requirements for households and institutions in rural or semi-urban communities are diverse - electrical, thermal, mechanical, etc. There are also several natural and other resources that are available as potential sources of energy. These may be underutilized or, at times, overexploited. The crucial need is for solutions that demonstrate their practical feasibility and ability to scale up to the required levels. Your task is to choose a rural community with just to mention
1. Number of people residing in the village
2. Dairies in the village
3. Food processing ( e.g. Sugarcane Industry)
4. Fresh water pond
5. School load
6. Hospital load
7. Shops , Khadi industry
Your challenge is to understand the community’s energy requirements, investigate the available resources, and then propose a design of the power plant meeting the above load requirements considering novel technology/methodology that is sustainable and cost-effective to improve the energy scenario in the community.
Hints:
1. You could look at newer sources of energy or novel energy conversion technology. You could also explore making current processes more efficient.
2. Area under the load curve should be equal to the energy input of the generator.
1. 3 Members per team
2. Participants should submit the power plant layout with proper equipment ratings on the Chart Paper
3. Running C/C++ Program or a printed report showing the operation of the power station, taking into consideration the above mentioned criteria.
4. Open for all the branches.
5. The presentation should not exceed 10+2 minutes.
6. Last date for submission of the chart and program is 24th Jan 2010.
VIPUL GOYAL
9991961997
DIVYA MITTAL
9813713190
VINEETA AHLAWAT
9812959006



